Supply of framing assembly equipment for LGS to Russia 11.07.2015 00:00
Royal Systems has signed a contract for the supply of 4 sets of assembly equipment for the assembly of wall and floor panels at the factory to the Central Federal District of the Russian Federation. The contract is scheduled for completion in August 2015.
Спасибо! Форма отправлена
Reprinting, as well as the use of materials from this site, is permitted only with the consent of the owner.